Industry Solutions

MBBR vs IFAS for Wastewater Retrofit: Which Fits an Existing Tank?

Compare MBBR and IFAS for wastewater-treatment retrofit projects. Learn how existing activated sludge, clarifiers, aeration, tank volume, ammonia load and media retention affect the choice.

When an existing wastewater-treatment plant needs more biological capacity, building a new aeration tank is not always the first option.
Many retrofit projects begin with a simpler question:
Can we increase biological capacity inside the tanks we already have?
Two common approaches are:
  • MBBR — Moving Bed Biofilm Reactor
  • IFAS — Integrated Fixed-Film Activated Sludge
Both use moving biofilm carriers, but they are not the same process.
The right choice depends on the existing plant configuration, not simply on which media has the highest surface area.

Quick Answer

MBBR is generally an attached-growth biological stage in which most of the intended biological capacity is developed on moving carriers. IFAS combines moving biofilm carriers with an existing suspended-growth activated-sludge process.
For an existing activated-sludge plant with functioning secondary clarifiers and return activated sludge, IFAS may be an attractive retrofit option because it adds attached-growth capacity while retaining the suspended biomass system.
Where a project needs a more independent biofilm stage, or where suspended-sludge inventory is not intended to remain the main process mechanism, MBBR may be more suitable.
The decision should be based on the complete process:
Existing Process → Current Limitation → Biological Duty → Tank Conditions → Aeration → Solids Separation → Retrofit Selection



MBBR vs IFAS: Basic Difference

Item
MBBR
IFAS
Main biological concept
Attached-growth biofilm
Attached growth + suspended activated sludge
Moving media
Yes
Yes
Suspended biomass
May exist, but is not normally the main controlled biomass inventory
Intentionally maintained as part of the process
RAS system
Not inherently required for the MBBR stage itself
Normally part of the existing activated-sludge process
Secondary clarifier dependence
Depends on overall process configuration
Usually important because suspended sludge must be settled and returned
Common retrofit role
Add a biofilm stage or increase attached-growth capacity
Increase capacity inside an existing activated-sludge basin
Key retrofit question
Can the tank support media, aeration and retention?
Can the existing AS + clarifier system support the hybrid process?
The important distinction is therefore not the plastic carrier itself.
It is how the carrier is integrated into the biological process.



1. Start With the Existing Process

Before choosing MBBR or IFAS, first document what already exists.
A retrofit assessment should identify:
  • existing process flow
  • aeration-tank volume
  • number of biological stages
  • activated-sludge concentration
  • return activated sludge arrangement
  • secondary clarifier capacity
  • blower capacity
  • diffuser arrangement
  • current dissolved oxygen
  • current sludge age or operating strategy
  • existing effluent performance
The same carrier can behave very differently depending on where it is installed.
A retrofit should therefore begin with the existing plant rather than with a media quotation.



2. What Problem Is the Retrofit Trying to Solve?

“Need more biological capacity” is not specific enough.
The plant may actually be experiencing:
  • high effluent ammonia
  • insufficient nitrification in winter
  • increased industrial production
  • higher BOD/COD load
  • insufficient aeration-tank volume
  • peak-load instability
  • limited sludge age
  • clarifier overload
  • excessive solids inventory
  • poor dissolved oxygen
  • hydraulic short-circuiting
These problems do not all point to the same retrofit solution.

Example

If ammonia removal is poor because nitrifiers cannot be maintained under the existing operating sludge age, attached biofilm can provide additional habitat for slow-growing nitrifying organisms.
But if the real limitation is insufficient oxygen supply, simply adding media may not solve the problem.
The first design question should therefore be:
What is actually limiting treatment performance today?



3. When MBBR May Fit Better

An MBBR retrofit may be attractive where the project wants to create or strengthen a dedicated attached-growth stage.
Typical situations can include:
  • limited available tank volume
  • need for additional biological surface area
  • new biological stage added inside an existing tank
  • upgrade from a simpler suspended-growth process
  • high-load pretreatment
  • ammonia polishing
  • industrial wastewater with variable organic load
  • projects where maintaining a large controlled suspended biomass inventory is not the main objective
An MBBR stage can also be used upstream or downstream of other biological processes.

Main MBBR Retrofit Checks

Before adding media, verify:
  • effective reactor volume
  • required biofilm area
  • allowable media fill
  • media movement
  • blower capacity
  • diffuser layout
  • dissolved oxygen
  • retention-screen design
  • hydraulic conditions
  • upstream solids load
The related HydroNovus calculation guide explains the basic sizing sequence:
Pollutant Load → Design Surface Loading → Required Biofilm Area → Media Volume → Fill Ratio → Reactor Check



4. When IFAS May Fit Better

IFAS is especially relevant when an existing activated-sludge system already has useful infrastructure that the owner wants to retain.
That can include:
  • aeration basin
  • activated sludge
  • return activated sludge system
  • secondary clarifiers
  • sludge-wasting system
Instead of abandoning this process, moving biofilm carriers are added to part of the biological basin.
The reactor then contains two biomass populations:

Suspended Biomass

Activated-sludge flocs remain in suspension and continue to perform biological treatment.

Attached Biomass

Biofilm develops on the moving carriers and provides additional biological inventory.
This is why IFAS is often described as a hybrid process.



5. IFAS Can Be Valuable for Nitrification Retrofit

Nitrification can become difficult when:
  • ammonia loading increases
  • wastewater temperature drops
  • available sludge age becomes insufficient
  • the plant receives larger production loads
  • existing tank volume cannot be increased
Biofilm carriers can provide additional surface for nitrifying organisms.
Because the attached biomass is retained on the carriers, it is not washed out in exactly the same way as suspended biomass leaving with mixed liquor.
This can make IFAS attractive for some nitrification upgrades.
But the carrier alone does not determine nitrification performance.
The retrofit must still check:
  • ammonia load
  • temperature
  • dissolved oxygen
  • alkalinity
  • pH
  • organic loading
  • carrier surface area
  • mixing
  • aeration
  • hydraulic retention
  • suspended biomass conditions



6. Existing Secondary Clarifiers Matter Much More in IFAS

This is one of the most important differences in retrofit evaluation.
In IFAS, the suspended activated-sludge population remains part of the treatment process.
That means the secondary clarification system remains important.
Before increasing biological inventory, check:
  • clarifier surface loading
  • solids loading
  • sludge settleability
  • return sludge capacity
  • peak hydraulic flow
  • sludge blanket behaviour
A biological retrofit can create more treatment capacity inside the aeration basin while still being limited by downstream solids separation.
Therefore:
More biomass in the aeration basin does not automatically mean more plant capacity.
The whole biological–clarification system must be checked.



7. MBBR Also Requires Solids Management

MBBR does not eliminate solids production.
Biofilm grows, ages and sloughs from the carrier.
These solids must eventually be separated from the treated water.
Depending on the process arrangement, downstream separation may include:
  • settling
  • clarification
  • flotation
  • filtration
  • other solids-removal stages
So an MBBR retrofit should not be designed as if adding carriers removes the need for solids management.
The difference is that the process does not rely on maintaining and returning the same suspended biomass inventory in the way a conventional activated-sludge or IFAS system does.



8. Aeration Can Become the Real Retrofit Limitation

Both MBBR and IFAS depend heavily on aeration in aerobic applications.
Aeration generally has two functions:
  1. Provide oxygen for biological treatment
  1. Maintain adequate carrier movement
Before adding media, check:
  • current blower airflow
  • blower pressure
  • operating water depth
  • diffuser condition
  • diffuser layout
  • dissolved oxygen
  • oxygen demand
  • available spare blower capacity
This is especially important in an existing plant.
If the aeration system is already operating close to its capacity, increasing biological inventory may increase oxygen demand beyond what the current system can provide.
Therefore:
Existing tank volume may not be the only constraint. Air capacity can be equally important.



9. Media Movement Must Be Verified

Moving carriers should remain distributed through the intended reactor zone.
Poor movement may lead to:
  • floating accumulation
  • media clustering
  • dead zones
  • uneven oxygen exposure
  • reduced usable carrier area
Movement depends on:
  • carrier density
  • carrier geometry
  • fill ratio
  • tank geometry
  • diffuser arrangement
  • airflow
  • water depth
  • internal structures
A retrofit therefore needs a hydraulic and aeration check, not just a calculation of media cubic metres.



10. Both Processes Need Media Retention

Moving carriers must remain inside the intended reactor.
Retention screens therefore become part of the retrofit.
Check:
  • carrier diameter
  • smallest carrier dimension
  • screen opening
  • screen area
  • maximum hydraulic flow
  • approach velocity
  • fouling risk
  • cleaning access
Adding a retention screen can also introduce hydraulic resistance.
This is especially important where the existing plant has limited hydraulic head.



11. Do Not Choose IFAS Just Because an Activated-Sludge Tank Exists

An existing activated-sludge basin does not automatically mean IFAS is the correct solution.
First check whether the existing suspended-growth process is worth retaining.
Questions include:
  • Is sludge settleability acceptable?
  • Are the clarifiers already overloaded?
  • Is the RAS system reliable?
  • Is bulking a recurring problem?
  • Is suspended-solids control stable?
  • Is the activated-sludge process fundamentally healthy?
If the existing suspended process itself has severe unresolved limitations, simply adding carriers may create a more complicated system without solving the root problem.



12. Do Not Choose MBBR Just Because It Looks Simpler

MBBR is often perceived as a simple retrofit:
Add carriers → add screens → increase capacity.
Actual projects require more engineering than that.
The retrofit may require changes to:
  • aeration
  • internal piping
  • media-retention screens
  • tank compartmentalization
  • hydraulic distribution
  • solids separation
  • blower capacity
  • process controls
The carrier is only one component of the biological retrofit.



MBBR vs IFAS Retrofit Decision Table

Project Condition
MBBR May Fit Better
IFAS May Fit Better
Existing activated-sludge infrastructure is strong
Possible
Often attractive
Existing secondary clarifiers are usable
Helpful
Important
Existing suspended biomass should be retained
Not essential
Yes
Need dedicated attached-growth stage
Yes
Possible
Retrofit primarily targets nitrification
Possible
Often worth evaluating
Existing clarifiers are already severely overloaded
Evaluate carefully
Potential limitation
Existing aeration has little spare capacity
Potential limitation
Potential limitation
Tank volume cannot be increased
Possible retrofit driver
Possible retrofit driver
Existing RAS system is unreliable
MBBR may reduce dependence on that process concept
IFAS requires careful review
Need independent biofilm reactor
Strong fit
Usually not the main objective
This table is only a preliminary screening tool.
The final decision should be based on process calculations.



A Practical Retrofit Decision Sequence

A useful engineering workflow is:

Step 1 — Define the Performance Gap

Determine:
  • current influent
  • current effluent
  • future load
  • required effluent

Step 2 — Calculate Biological Loading

Review:
  • flow
  • BOD/COD
  • ammonia
  • nitrogen target
  • temperature
  • peak conditions

Step 3 — Check Existing Tank Capacity

Document:
  • effective volume
  • water depth
  • number of basins
  • available retrofit zones

Step 4 — Check Aeration

Determine whether the current blower and diffuser system can support additional biological activity and carrier movement.

Step 5 — Check Existing Activated Sludge

If considering IFAS, evaluate:
  • MLSS
  • sludge age
  • settling
  • RAS
  • clarifier loading

Step 6 — Estimate Required Biofilm Area

Only now should the required carrier surface area and media quantity be evaluated.

Step 7 — Check Media Retention and Hydraulics

Verify screens, head loss and peak flow.

Step 8 — Compare MBBR and IFAS

Select the configuration that best fits the existing plant, rather than forcing the plant to fit a particular media product.



Data Needed Before Evaluating an MBBR or IFAS Retrofit

Wastewater Data

  • average flow
  • peak flow
  • BOD
  • COD
  • ammonia / NH₄-N
  • total nitrogen where relevant
  • suspended solids
  • pH
  • alkalinity
  • temperature

Treatment Target

  • required BOD/COD
  • ammonia target
  • TN target where applicable
  • discharge or reuse requirement

Existing Biological System

  • process type
  • tank dimensions
  • effective volume
  • MLSS
  • current sludge age if available
  • dissolved oxygen
  • operating problems

Aeration System

  • blower quantity
  • blower airflow
  • operating pressure
  • diffuser type
  • diffuser layout
  • water depth

Clarification System

For activated-sludge / IFAS retrofit:
  • clarifier dimensions
  • peak hydraulic load
  • solids loading
  • sludge settleability
  • RAS flow

Existing Media

If carriers are already installed:
  • carrier type
  • media volume
  • fill ratio
  • carrier dimensions
  • current movement



Common Retrofit Mistakes

Mistake
Better Approach
Selecting MBBR or IFAS before identifying the real bottleneck
Diagnose the existing process first
Calculating media from tank volume alone
Calculate biological load first
Ignoring aeration capacity
Check oxygen demand and mixing
Assuming IFAS solves clarifier limitations
Verify solids-separation capacity
Treating IFAS as simply “MBBR inside activated sludge”
Evaluate both attached and suspended biomass systems
Ignoring retention screens
Check carrier size, screen area and hydraulics
Selecting the highest-surface-area carrier
Compare usable area and actual reactor conditions
Assuming adding media always increases plant capacity
Check the complete process train



Frequently Asked Questions

Is IFAS the same as MBBR?

No. Both use moving biofilm carriers, but IFAS intentionally combines attached biofilm with a suspended activated-sludge population. MBBR is primarily designed around attached-growth treatment.

Can MBBR media be added directly into an existing activated-sludge tank?

Physically adding media is only one part of the retrofit. The project must also evaluate media retention, aeration, mixing, biological loading, hydraulics and downstream solids separation.

Is IFAS better for ammonia removal?

IFAS can be attractive for nitrification retrofit because attached biofilm provides additional biomass retention, including habitat for nitrifying organisms. Actual performance still depends on temperature, oxygen, alkalinity, ammonia load and other operating conditions.

Can MBBR increase capacity without building a new tank?

Potentially, yes. Adding attached-growth surface can increase biological inventory within an existing volume. But aeration, hydraulics, media movement, retention and downstream treatment may become the limiting factors.

Does IFAS require a secondary clarifier?

Typical IFAS systems retain the activated-sludge portion of the process, so solids separation and return sludge are normally important parts of the overall system.

How much MBBR media should be added during a retrofit?

Media quantity should be calculated from biological load, design surface loading, usable carrier surface area and reactor conditions. It should not be determined from tank volume alone.



Related Technical Resources

  • How to Calculate MBBR Media Volume: Load, SALR, Fill Ratio and Reactor Volume
  • Why Specific Surface Area Alone Is Not Enough to Select MBBR Media
  • HDPE MBBR Biofilter Media for Wastewater & RAS
  • Fine Bubble Disc Diffuser
  • Fine Bubble Tube Diffuser



Planning a Biological Retrofit?

If an existing wastewater-treatment plant is approaching its biological capacity, the first decision should not be:
How much media should we buy?
Start with:
What is limiting the existing process, and what biological capacity must be added?
Send HydroNovus the flow, influent and effluent data, biological tank dimensions, ammonia/BOD load, temperature, aeration information and existing sludge-process data.
We can then evaluate whether MBBR, IFAS or another biological retrofit approach is more appropriate before calculating media quantity.
Discuss Your Retrofit Project → /contact